Projets
Laubenhof, Konstanz

We are committed to executing an ambitious residential and commercial project in the heart of Konstanz, known as Laubenhof.

The project includes the construction of 7 buildings with a total of 126 apartments and 3 commercial units, all connected through a two-story underground garage with 162 parking spaces.

The underground and above-ground structure, built with waterproof concrete and solid reinforcements, provides stability and durability to the entire construction.

Date d'achèvement
July 2021 – May 2022
Latest projects
Hans-Thoma-Höfe Residential Area, Donaueschingen

The new Hans-Thoma-Höfe are being built between Hindenburgring, Dürrheimer, Hans-Thoma- and Hansjakobstraße. It consists of a total of six apartment blocks with three floors. Each building is connected by a common underground garage.

The new Hans-Thoma-Höfe are being built between Hindenburgring, Dürrheimer, Hans-Thoma- and Hansjakobstraße. It consists of a total of six apartment blocks with three floors. Each building is connected by a common underground garage.

Voir plus de détails
Health and Wellness Hotel Sea Palace, Konstanz

n an exceptional location, on a beautiful plot near the lake in Konstanz, a superior class 5-star health resort is being constructed, with 108 rooms and suites and 20 rooms for athletes. The construction project is divided into two sections: a massive underground garage and a massive ground floor.

The following floors, from one to five, will be constructed using a timber construction system. Here, only the three stair towers will be made of reinforced concrete.

The basement and ground floor will be entirely built of massive reinforced concrete. The supporting structure is based on approximately 800 ductile reinforced concrete piles, covered by a 50 cm thick reinforced concrete base slab. In the basement, multiple double parking spaces and a generous SPA area will be created.

n an exceptional location, on a beautiful plot near the lake in Konstanz, a superior class 5-star health resort is being constructed, with 108 rooms and suites and 20 rooms for athletes. The construction project is divided into two sections: a massive underground garage and a massive ground floor.

The following floors, from one to five, will be constructed using a timber construction system. Here, only the three stair towers will be made of reinforced concrete.

The basement and ground floor will be entirely built of massive reinforced concrete. The supporting structure is based on approximately 800 ductile reinforced concrete piles, covered by a 50 cm thick reinforced concrete base slab. In the basement, multiple double parking spaces and a generous SPA area will be created.

Voir plus de détails