Hans-Thoma-Höfe Residential Area, Donaueschingen

The new Hans-Thoma-Höfe are being built between Hindenburgring, Dürrheimer, Hans-Thoma- and Hansjakobstraße. It consists of a total of six apartment blocks with three floors. Each building is connected by a common underground garage.

Area
5500m²
Completion date
January 2023– December 2023
Latest projects
Laubenhof, Konstanz

We are committed to executing an ambitious residential and commercial project in the heart of Konstanz, known as Laubenhof.

The project includes the construction of 7 buildings with a total of 126 apartments and 3 commercial units, all connected through a two-story underground garage with 162 parking spaces.

The underground and above-ground structure, built with waterproof concrete and solid reinforcements, provides stability and durability to the entire construction.

We are committed to executing an ambitious residential and commercial project in the heart of Konstanz, known as Laubenhof.

The project includes the construction of 7 buildings with a total of 126 apartments and 3 commercial units, all connected through a two-story underground garage with 162 parking spaces.

The underground and above-ground structure, built with waterproof concrete and solid reinforcements, provides stability and durability to the entire construction.

View more details
Telekom Areal, Konstanz

The tall administrative building located in the former Telekom area of Konstanz Petershausen is set to be transformed into luxury apartments. For this purpose, new balconies will be added on the east and west sides, and a fire lift will be installed within the slightly modified existing elevator shaft. On the north and east sides, a new underground garage will be constructed at the first basement level (1.UG). The currently existing underground shelter will be demolished.

The tall administrative building located in the former Telekom area of Konstanz Petershausen is set to be transformed into luxury apartments. For this purpose, new balconies will be added on the east and west sides, and a fire lift will be installed within the slightly modified existing elevator shaft. On the north and east sides, a new underground garage will be constructed at the first basement level (1.UG). The currently existing underground shelter will be demolished.

View more details