The Nikolauspflege Foundation is planning the construction of a new school and a sports hall on the Nikolauspflege campus in Stuttgart. The planned new construction consists of a school with a sports hall (height approx. 7.00 m), which is connected to the existing building H in the northwest by a connecting structure approximately 30 m long. The school is planned with a continuous underground garage measuring approx. 55 m x 38 m. The sports hall has a size of approx. 21 m x 29 m and connects to the underground garage in the southeast.
A viewing platform has been in place at the prison's major construction site starting February 2024. And since then, it has been well frequented - within sight of the test tower. The huge prison building arouses curiosity.
It is probably the largest construction site in the Rottweil
district at the moment: the state's new correctional facility has been under construction in "Esch" near Rottweil for just over a year .
Mayor Christian Ruf speaks of "by far the largest
infrastructure project that the state of Baden-Württemberg has ever implemented in our city.
A viewing platform has been in place at the prison's major construction site starting February 2024. And since then, it has been well frequented - within sight of the test tower. The huge prison building arouses curiosity.
It is probably the largest construction site in the Rottweil
district at the moment: the state's new correctional facility has been under construction in "Esch" near Rottweil for just over a year .
Mayor Christian Ruf speaks of "by far the largest
infrastructure project that the state of Baden-Württemberg has ever implemented in our city.
n an exceptional location, on a beautiful plot near the lake in Konstanz, a superior class 5-star health resort is being constructed, with 108 rooms and suites and 20 rooms for athletes. The construction project is divided into two sections: a massive underground garage and a massive ground floor.
The following floors, from one to five, will be constructed using a timber construction system. Here, only the three stair towers will be made of reinforced concrete.
The basement and ground floor will be entirely built of massive reinforced concrete. The supporting structure is based on approximately 800 ductile reinforced concrete piles, covered by a 50 cm thick reinforced concrete base slab. In the basement, multiple double parking spaces and a generous SPA area will be created.
n an exceptional location, on a beautiful plot near the lake in Konstanz, a superior class 5-star health resort is being constructed, with 108 rooms and suites and 20 rooms for athletes. The construction project is divided into two sections: a massive underground garage and a massive ground floor.
The following floors, from one to five, will be constructed using a timber construction system. Here, only the three stair towers will be made of reinforced concrete.
The basement and ground floor will be entirely built of massive reinforced concrete. The supporting structure is based on approximately 800 ductile reinforced concrete piles, covered by a 50 cm thick reinforced concrete base slab. In the basement, multiple double parking spaces and a generous SPA area will be created.