Progetti
MU4 Dätzweg, Rottenburg

We executed the construction of the MU4 Dätzweg residential project, part of the new neighborhood in Rottenburg.

In this project, we constructed a complex underground garage that serves both the residents and the nearby kindergarten.

Due to the building's proximity to the railway, we employed innovative solutions, including vibrating mats, to absorb mechanical vibrations and ensure the comfort of the residents.

Data di completamento
September 2022 - April 2023
Telekom Areal, Konstanz

The tall administrative building located in the former Telekom area of Konstanz Petershausen is set to be transformed into luxury apartments. For this purpose, new balconies will be added on the east and west sides, and a fire lift will be installed within the slightly modified existing elevator shaft. On the north and east sides, a new underground garage will be constructed at the first basement level (1.UG). The currently existing underground shelter will be demolished.

The tall administrative building located in the former Telekom area of Konstanz Petershausen is set to be transformed into luxury apartments. For this purpose, new balconies will be added on the east and west sides, and a fire lift will be installed within the slightly modified existing elevator shaft. On the north and east sides, a new underground garage will be constructed at the first basement level (1.UG). The currently existing underground shelter will be demolished.

Visualizza più dettagli
Bosch Production 141b + 144a Reutlingen

Robert Bosch GmbH intends to build a new 200 mm wafer factory at the existing location in Reutlingen, with approximately 3,600 m² of clean room production area, plus the adjacent spaces necessary for operation, as well as supply and disposal facilities. The expansion includes an additional technical building, as well as the necessary connections via a pipe rack and a separate link or articulation tower.

Robert Bosch GmbH intends to build a new 200 mm wafer factory at the existing location in Reutlingen, with approximately 3,600 m² of clean room production area, plus the adjacent spaces necessary for operation, as well as supply and disposal facilities. The expansion includes an additional technical building, as well as the necessary connections via a pipe rack and a separate link or articulation tower.