Promenada Mall Extension, Bucharest, Romania

As part of the Promenada Mall extension project in Bucharest, 3D Bau carried out extensive excavation works, crucial for preparing the foundations of the new structure. Our team executed deep and complex excavations, covering a total volume of over 100,000 cubic meters of earth, which required meticulous planning and precise execution.

We utilized modern equipment and advanced technologies to ensure soil stability and mitigate any risks associated with this type of work. Additionally, we completed the excavations in record time, adhering to all safety requirements and quality standards, thereby contributing to the overall success of the extension project.

This large-scale project demonstrated 3D Bau's capability to manage extensive excavation works, reinforcing our positi

Data di completamento
March 2022 – September 2024
St. Anna Senior Center, Schwäbisch Gmünd

St. Anna Senior Center in Schwäbisch Gmünd, a project that redefines modern care, with access to a spacious roof terrace for all patients

St. Anna Senior Center in Schwäbisch Gmünd, a project that redefines modern care, with access to a spacious roof terrace for all patients

Visualizza più dettagli
Telekom Areal, Konstanz

The tall administrative building located in the former Telekom area of Konstanz Petershausen is set to be transformed into luxury apartments. For this purpose, new balconies will be added on the east and west sides, and a fire lift will be installed within the slightly modified existing elevator shaft. On the north and east sides, a new underground garage will be constructed at the first basement level (1.UG). The currently existing underground shelter will be demolished.

The tall administrative building located in the former Telekom area of Konstanz Petershausen is set to be transformed into luxury apartments. For this purpose, new balconies will be added on the east and west sides, and a fire lift will be installed within the slightly modified existing elevator shaft. On the north and east sides, a new underground garage will be constructed at the first basement level (1.UG). The currently existing underground shelter will be demolished.

Visualizza più dettagli