Panorama Konstanz, Bodensee, Baden-Württemberg

3DBau is pleased to participate in the realization of an innovative construction project that will reshape the face of Konstanz. The building, with an impressive height of 50 meters, will stand as a new landmark at the city's entrance, adding a distinctive and modern element. Its design, based on the principle of kinetic polychromy, creates an optical illusion of movement, providing a creative response to the traffic-dominated urban landscape.

For this project, the supporting structure and interior walls will be constructed from wood above the ground floor, complemented by the use of exposed concrete poured in situ, showcasing our commitment to excellence in execution. By transforming this neutral site into a tourist destination, the building will serve as a dual attraction: capturing attention from a distance and offering a unique perspective on the city, its surroundings, and its history from within.

Completion date
May 2024 – December 2024
Latest projects
Bosch Production 141b + 144a Reutlingen

Robert Bosch GmbH intends to build a new 200 mm wafer factory at the existing location in Reutlingen, with approximately 3,600 m² of clean room production area, plus the adjacent spaces necessary for operation, as well as supply and disposal facilities. The expansion includes an additional technical building, as well as the necessary connections via a pipe rack and a separate link or articulation tower.

Robert Bosch GmbH intends to build a new 200 mm wafer factory at the existing location in Reutlingen, with approximately 3,600 m² of clean room production area, plus the adjacent spaces necessary for operation, as well as supply and disposal facilities. The expansion includes an additional technical building, as well as the necessary connections via a pipe rack and a separate link or articulation tower.

View more details
Health and Wellness Hotel Sea Palace, Konstanz

n an exceptional location, on a beautiful plot near the lake in Konstanz, a superior class 5-star health resort is being constructed, with 108 rooms and suites and 20 rooms for athletes. The construction project is divided into two sections: a massive underground garage and a massive ground floor.

The following floors, from one to five, will be constructed using a timber construction system. Here, only the three stair towers will be made of reinforced concrete.

The basement and ground floor will be entirely built of massive reinforced concrete. The supporting structure is based on approximately 800 ductile reinforced concrete piles, covered by a 50 cm thick reinforced concrete base slab. In the basement, multiple double parking spaces and a generous SPA area will be created.

n an exceptional location, on a beautiful plot near the lake in Konstanz, a superior class 5-star health resort is being constructed, with 108 rooms and suites and 20 rooms for athletes. The construction project is divided into two sections: a massive underground garage and a massive ground floor.

The following floors, from one to five, will be constructed using a timber construction system. Here, only the three stair towers will be made of reinforced concrete.

The basement and ground floor will be entirely built of massive reinforced concrete. The supporting structure is based on approximately 800 ductile reinforced concrete piles, covered by a 50 cm thick reinforced concrete base slab. In the basement, multiple double parking spaces and a generous SPA area will be created.

View more details