Health and Wellness Hotel Sea Palace, Konstanz

n an exceptional location, on a beautiful plot near the lake in Konstanz, a superior class 5-star health resort is being constructed, with 108 rooms and suites and 20 rooms for athletes. The construction project is divided into two sections: a massive underground garage and a massive ground floor.

The following floors, from one to five, will be constructed using a timber construction system. Here, only the three stair towers will be made of reinforced concrete.

The basement and ground floor will be entirely built of massive reinforced concrete. The supporting structure is based on approximately 800 ductile reinforced concrete piles, covered by a 50 cm thick reinforced concrete base slab. In the basement, multiple double parking spaces and a generous SPA area will be created.

Bereich
1300m²
Fertigstellungsdatum
December 2021 – November 2022
Latest projects
Neubau, Justizvollzugsanstalt Rottweil

A viewing platform has been in place at the prison's major construction site starting February 2024. And since then, it has been well frequented - within sight of the test tower. The huge prison building arouses curiosity.

It is probably the largest construction site in the Rottweil 
district at the moment: the state's new correctional facility has been under construction in "Esch" near Rottweil for just over a year .

Mayor Christian Ruf speaks of "by far the largest 
infrastructure project that the state of Baden-Württemberg has ever implemented in our city.

A viewing platform has been in place at the prison's major construction site starting February 2024. And since then, it has been well frequented - within sight of the test tower. The huge prison building arouses curiosity.

It is probably the largest construction site in the Rottweil 
district at the moment: the state's new correctional facility has been under construction in "Esch" near Rottweil for just over a year .

Mayor Christian Ruf speaks of "by far the largest 
infrastructure project that the state of Baden-Württemberg has ever implemented in our city.

Mehr Details anzeigen
Bosch Production 141b + 144a Reutlingen

Robert Bosch GmbH intends to build a new 200 mm wafer factory at the existing location in Reutlingen, with approximately 3,600 m² of clean room production area, plus the adjacent spaces necessary for operation, as well as supply and disposal facilities. The expansion includes an additional technical building, as well as the necessary connections via a pipe rack and a separate link or articulation tower.

Robert Bosch GmbH intends to build a new 200 mm wafer factory at the existing location in Reutlingen, with approximately 3,600 m² of clean room production area, plus the adjacent spaces necessary for operation, as well as supply and disposal facilities. The expansion includes an additional technical building, as well as the necessary connections via a pipe rack and a separate link or articulation tower.

Mehr Details anzeigen